Expense and Scheduling Balance in Construction Projects Using Fuzzy Method

Publish Year: 1396
نوع سند: مقاله کنفرانسی
زبان: English
View: 472

This Paper With 9 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

این Paper در بخشهای موضوعی زیر دسته بندی شده است:

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

CCIVIL02_584

تاریخ نمایه سازی: 29 مهر 1396

Abstract:

Projects are a series of unique activities defined in order to achieve a unique goal. Before implementation,project activities to be conducted in future are predicted and the initial timetable of the project is prepared. Given the fact that future is vague and unclear, risks and uncertainties will inevitably exist in the implementation of projects because human is unable to precisely foresee the future. Projects are planned according to estimations obtained from little information about the future conditions of projects. Considering the fact that the planning involve uncertainty, time delays and costs imposed by uncertainties are unavoidable .Risk management is a project management standard used extensively. The effects of the risk of time and cost were simultaneously investigated in one of the huge, national projects in Iran, namely the water supply project. Information pertaining to risk management was gathered, and fuzzy number theory, fuzzy logic, software, and information analysis and combination were employed. A model was put forward including 7 stages and 20 steps in SPSS, and MATLAB was also utilized in civil projects for increasing planning accuracy. The results differed from those of existing, traditional methods, such as the method of probability of occurrence * degree of impact, for risk management.

Authors

Mohsen Kebriti

Department of Civil Engineering, Qeshm Branch, Islamic Azad University, Qeshm ،Iran