AN OVERALL PROJECT CONCEPT OF 3x105 MW MONTAZERGHAEM COMBINED CYCLE POWER PLANT

Publish Year: 1375
Type: Conference paper
Language: English
View: 2,315

This Paper With 8 Page And PDF Format Ready To Download

Export:

Link to this Paper:

Document National Code:

PSC11_016

Index date: 14 September 2007

AN OVERALL PROJECT CONCEPT OF 3x105 MW MONTAZERGHAEM COMBINED CYCLE POWER PLANT abstract

The project management of combined cycle power plant 3x105MW MONTAZERGHAEM, IRAN, paved the way for the manufacturing of first Iran's 125MVA, air cooled generator in the country. This paper presents an overall project concept, design selections, site layout problems, of CCPP major equipments like HRSG, Steam Turbine Generator, Power Supply schemes, I&C, Cooling Tower, W.T, etc. This conversion of power from the existing gas turbines model-GE 916IE would not only gain saving millions of dollars per year for this plant, but also preserves national wealth (fuel oil/gas).In addition, the CCPP would run at an efficiency of 48%.

AN OVERALL PROJECT CONCEPT OF 3x105 MW MONTAZERGHAEM COMBINED CYCLE POWER PLANT authors

Shokrollahi

Mapna Company Tehran - Iran

Dehdari

Mapna Company Tehran - Iran

Ehsani

Mapna Company Tehran - Iran

Nanjappa

Mapna Company Tehran - Iran

مراجع و منابع این Paper:

لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :
Modern Power Station Practice Vol (A to H) British Electricity ...
Gas Turbine Devel opments _ VEGA - A standard range ...
Teleperm XP-Process Control System for all types of power plant-S ...
نمایش کامل مراجع