Life Cycle Cost Comparison between GIS and Conventional High Voltage Substations
Publish place: 15th International Power System Conference
Publish Year: 1378
Type: Conference paper
Language: English
View: 2,391
This Paper With 7 Page And PDF Format Ready To Download
- Certificate
- I'm the author of the paper
Export:
Document National Code:
PSC15_101
Index date: 23 September 2007
Life Cycle Cost Comparison between GIS and Conventional High Voltage Substations abstract
The aim of this article is to introduce and recommend an improved method of planning and evaluating high voltage substations. To scrutinise different kinds of switchgear solutions with the objective to achieve sustained business profitability, it is recommended to use:
1. Functional Specifications instead of the common detailed technical specifications of the substation, and a
2. Life Cycle Cost LW calculation model instead of the common Procurement Cost comparison.
The article emphasises the economic benefits that can be derived by the use of the Functional Specification and Life Cycle Cost approach. In contrast to the conventional way of describing the planned substation by a single line diagram and the associated detailed descriptions of the technical requirements on the different components, this method is based on a systematic description of the substation in terms of its availability, which is a function of its reliability and outage time.
Life Cycle Cost Comparison between GIS and Conventional High Voltage Substations Keywords:
Life Cycle Cost Comparison between GIS and Conventional High Voltage Substations authors
مراجع و منابع این Paper:
لیست زیر مراجع و منابع استفاده شده در این Paper را نمایش می دهد. این مراجع به صورت کاملا ماشینی و بر اساس هوش مصنوعی استخراج شده اند و لذا ممکن است دارای اشکالاتی باشند که به مرور زمان دقت استخراج این محتوا افزایش می یابد. مراجعی که مقالات مربوط به آنها در سیویلیکا نمایه شده و پیدا شده اند، به خود Paper لینک شده اند :