SALTO CAXIAS - A ROTOR RIM SHRINKING PROBLEM DETECTED BY AIR GAP MONITORING SYSTEM AT COMMISSIONING

Publish Year: 1381
نوع سند: مقاله کنفرانسی
زبان: English
View: 1,776

This Paper With 10 Page And PDF Format Ready To Download

  • Certificate
  • من نویسنده این مقاله هستم

استخراج به نرم افزارهای پژوهشی:

لینک ثابت به این Paper:

شناسه ملی سند علمی:

PSC17_132

تاریخ نمایه سازی: 8 مهر 1386

Abstract:

This paper describes COPEL's experience using the Air Gap Monitoring System (AGMS) at Salto Caxias Power Plant commissioning. An insufficient rotor rim shrinking was detected on all four units using the system. The repairs and verification using the AGMS saved significant time and costs. The new method should be adopted in the future since it detects problems before the commercial operation of the units. Test results comparison is made before and after corrective action, showing the AGMS ability to detect the problem and to confirm the repair effectiveness.

Authors

Pedro Massanori Sakuma

COPEL - Companhia Paranaense de Energia Parand - Brazil

Alvaro Jose Noe Fogaga

COPEL - Companhia Paranaense de Energia Parand - Brazil

Orlete Nogarolli

COPEL - Companhia Paranaense de Energia Parand - Brazil